What was found
Waitaki’s 2016/17 report records resident satisfaction of 47% for sealed roads and 27% for unsealed roads. Both satisfaction measures missed their targets; the sealed-road smoothness measure was achieved.
It also records that SouthRoads’ new maintenance contract began on 1 July 2017. The satisfaction reporting period preceded that start, so these results cannot establish SouthRoads’ performance under the new contract.
Recorded facts
Source context
- Network satisfaction is not a site inspection or a finding of contractor fault.
Follow the evidence
Original sources
Source 1 · Waitaki District Council
Annual Report Summary 2016/17
Source date: Not supplied
Document status: Annual report summary for 2016/17
Relevant PDF page: 7
About this summary
ConsumerWatch prepared this source summary after checking the linked publication. It records a dated source account and the limits of what that source establishes. Source dates describe the original material; checking an older source again does not make the event new.
For the full wording, follow the original source. Provide a response or request a correction.
